Renovations made to SU campus over the summer
Improvements to a few residence halls and several academic buildings were the focus of campus-wide construction done over the summer.
Shaw Hall underwent some of the biggest changes, including a new entrance. Plans for future construction and renovations projects were also discussed and set in place this summer.
Here is a look at the changes that have been made to various buildings and locations on the SU campus.
Watson Hall
- New outdoor space includes a paver patio area, plantings, sidewalks and a gas fire pit
- Tables, chairs and benches are coming soon, according to an email sent by Chancellor Kent Syverud
Mount Olympus stair landing
- New landing, replacing the previously covered bottom portion of the stairs, features granite steps, brick paver landings and a teak bench seating area
- Heating in the steps, landings and sidewalks will ensure snow- and ice-free passage in winter for those traveling to and from Day and Flint Halls
- A new covering will be installed in September
Sadler Hall
- The built-ins, furniture and room doors have been replaced in all student rooms
- Upgraded finishes have been added throughout the residence hall with new flooring and fresh paint schemes
- The lobby and main lounge were renovated, including a more straightforward card access process
Hunting Beard Crouse Hall
- Kittredge Auditorium was expanded and renovated
- Construction was completed on accessible restrooms and a lactation room on the lower level, as well as an addition of a second single-occupancy restroom in the Gifford Auditorium lobby
- There are plans to add an elevator stop at the Gifford Auditorium level next summer
Marion/Kimmel
- New paint schemes
- New flooring
- Refinished wood doors and built-in wood furniture
Day Hall
- A more curbside sidewalk in the front of the building
- An additional ADA ramp
Holden Observatory
- New accessible entrance walkway
Falk College
- Updates to the building in order to house new departments
South Crouse Drive
- Upgrades to stream and electrical distribution systems
Link Hall
- Updated brick exterior on the top portion of the walls
Carnegie
- New office suites in the Math Department
- Fully accessible bathrooms on each level
- Upgraded heating system
Newhouse II
- New classrooms, offices
- New computer clusters
Slocum Heights Apartments
- Balcony and walkway repairs
Engineering Lab on South Campus
- New building on South Campus
Vielbig Outdoor Running Track
- New outdoor running track with turf field
Published on August 26, 2015 at 12:07 am
Contact Sara: smswann@syr.edu | @saramswann